Publish Time: 2016-12-12 Origin: Site
The first slitter rewinder was displaced within the production hall,and an exsiting
packaging line replaced by a new one which is equipped with a robot.
What is more is that the line has been connected to a new MES.
The aim of these measures was to improve the material flow significantly.
Parts of the handing of the packaging line of the second slitter rewinder
has been removed and replaced by a robot.
As with the first slitter rewinder,the second one also has been connected to the MES.